Test Fill for Rock Fill Dams: Orano Canada Inc. McClean Lake Operation’s 2021 Expansion Embankment for the JEB Tailings
Tue, Mar 15
|Saskatoon
Come watch Sara Seabrook from WSP Golder Associates give a presentation which summarizes the results and recommendations following the waste rock test fill construction for Orano’s uranium tailings management facility expansion embankment construction in 2021.
Time & Location
Mar 15, 2022, 12:00 p.m. – 1:00 p.m. CST
Saskatoon, 810 Circle Dr E #109, Saskatoon, SK S7K 3T8, Canada
About The Event
Test fills for rock fill dams are of great value to help the designer determine the effect of construction methods including maximum rock sizes, the lift thickness and compaction effort on the amount of degradation or segregation occurring during compaction, and geotechnical properties of the compacted fill, such as density and grain-size distribution. Sara’s presentation summarizes the results and recommendations following the waste rock test fill construction for Orano’s uranium tailings management facility expansion embankment construction in 2021.
Sara Seabrook, P.Eng. – Ms. Seabrook is a geotechnical engineer with WSP Golder Associates’ Saskatoon office. Her consulting career began in 1999 as an engineering technologist and she currently holds a bachelor’s degree in civil engineering from the University of Saskatchewan. Sara has 20 years of experience in a wide variety of civil design, construction QA/QC, geotechnical and hydrogeological site characterization, and physical and contaminant hydrogeology projects for clients across western Canada. Currently, Ms. Seabrook fulfills the role of Project Engineer supporting the Engineer of Record team involved in the expansion detailed design and construction of Orano’s JEB tailings management facility in Northern Saskatchewan.
Tickets
Early Bird
$25.00Sale endedRegular
$30.00Sale ended
Total
$0.00